    铸件供应商认可程序审核准则(9)南京TPG_AS7127
    发表时间:2021-06-24     阅读次数:     字体:【

    20. JOB AUDIT #1

    A minimum of two job audits are required. However, the number of job audits depends on the scope of the audit. Sufficient auditing of the processes and material cast must be conducted so as to satisfactorily answer all questions. If multiple shifts are used, part of the audit shall occur on each shift. If melting and casting occurs only at night, at least 4 continuous hours of auditing shall occur on the night shift Any noncompliance, with respect to existence, adequacy, and/or compliance, observed during the job audits, should be recorded as an NCR on the applicable checklist question/paragraph above, and the NCR should include a reference to the Job audit number for which the noncompliance was observed.

    20.1 Date: _______________

    20.2 Job Number: _______________

    20.3 Customer: _______________

    20.4 Part Number: _______________

    20.5 Drawing Number and Rev. Level: _______________

    20.6 Molding Process: _______________

    20.7 Core Making Process: _______________

    20.8 Metal Type: _______________

    20.9 Melt Equipment: _______________

    YES NO

    20.10 Heat Number: _______________

    20.11 Operations Witnessed: YES/NO

    20.12 Sand Preparation YES/NO

    20.13 Mold Making YES/NO

    20.14 Core Making YES/NO

    20.15 Melting YES/NO

    20.16 Pouring YES/NO

    20.17 Required Melt temperature into the Furnace: _______________

    YES NO

    20.18 Actual Melt temperature into the Furnace (at the end of melting): _______________

    YES NO

    20.19 Melt temperature at Start of Pouring: _______________

    YES NO

    20.20 Maximum Pouring Time Range required: _______________

    YES NO

    20.21 Actual Pouring Time: _______________

    YES NO

    20.22 Desprue YES/NO/NA

    20.23 If special processes are subcontracted (Welding, Shot Peening, Heat Treating and/or NDT) do the approved sources have active TPG accreditations as required by customer? YES/NO/NA

    20.24 Clean/Shot Blasting YES/NO/NA

    20.25 Grind/Inspect YES/NO/NA

    20.26 Packaging YES/NO/NA

    20.27 Shipping YES/NO

    21. JOB AUDIT #2

    21.1 Date: _______________

    21.2 Job Number: _______________

    21.3 Customer: _______________

    21.4 Part Number: _______________

    21.5 Drawing Number and Rev. Level: _______________

    21.6 Molding Process: _______________

    21.7 Core Making Process: _______________

    21.8 Metal Type: _______________

    21.9 Melt Equipment: _______________

    YES NO

    21.10 Heat Number: _______________

    21.11 Operations Witnessed: YES/NO

    21.12 Sand Preparation YES/NO

    21.13 Mold Making YES/NO

    21.14 Core Making YES/NO

    21.15 Melting YES/NO

    21.16 Pouring YES/NO

    21.17 Required Melt temperature into the Furnace: _______________

    YES NO

    21.18 Actual Melt temperature into the Furnace (at the end of melting): _______________

    YES NO

    21.19 Melt temperature at Start of Pouring: _______________

    YES NO

    21.20 Maximum Pouring Time Range required: _______________

    YES NO

    21.21 Actual Pouring Time: _______________

    YES NO

    21.22 Desprue YES/NO/NA

    21.23 If special processes are subcontracted (Welding, Shot Peening, Heat Treating and/or NDT) do the approved sources have active TPG accreditations as required by customer? YES/NO/NA

    21.24 Clean/Shot Blasting YES/NO/NA

    21.25 Grind/Inspect YES/NO/NA

    21.26 Packaging YES/NO/NA

    21.27 Shipping YES/NO/NA


     