    22. JOB AUDIT #3 SECTION NA

    22.1 Date: _______________

    22.2 Job Number: _______________

    22.3 Customer: _______________

    22.4 Part Number: _______________

    22.5 Drawing Number and Rev. Level: _______________

    22.6 Molding Process: _______________

    22.7 Core Making Process: _______________

    22.8 Metal Type: _______________

    22.9 Melt Equipment: _______________

    YES NO

    22.10 Heat Number: _______________

    22.11 Operations Witnessed: YES/NO

    22.12 Sand Preparation YES/NO

    22.13 Mold Making YES/NO

    22.14 Core Making YES/NO

    22.15 Melting YES/NO

    22.16 Pouring YES/NO

    22.17 Required Melt temperature into the Furnace: _______________

    YES NO

    22.18 Actual Melt temperature into the Furnace (at the end of melting): _______________

    YES NO

    22.19 Melt temperature at Start of Pouring: _______________

    YES NO

    22.20 Maximum Pouring Time Range required: _______________

    YES NO

    22.21 Actual Pouring Time: _______________

    YES NO

    22.22 Desprue YES/NO/NA

    22.23 If special processes are subcontracted (Welding, Shot Peening, Heat Treating and/or NDT) do the approved sources have active TPG accreditations as required by customer? YES/NO/NA

    22.24 Clean/Shot Blasting YES/NO/NA

    22.25 Grind/Inspect YES/NO/NA

    22.26 Packaging YES/NO/NA

    22.27 Shipping YES/NO

    23. JOB AUDIT #4 SECTION NA

    23.1 Date: _______________

    23.2 Job Number: _______________

    23.3 Customer: _______________

    23.4 Part Number: _______________

    23.5 Drawing Number and Rev. Level: _______________

    23.6 Molding Process: _______________

    23.7 Core Making Process: _______________

    23.8 Metal Type: _______________

    23.9 Melt Equipment: _______________

    YES NO

    23.10 Heat Number: _______________

    23.11 Operations Witnessed: YES/NO

    23.12 Sand Preparation YES/NO

    23.13 Mold Making YES/NO

    23.14 Core Making YES/NO

    23.15 Melting YES/NO

    23.16 Pouring YES/NO

    23.17 Required Melt temperature into the Furnace: _______________

    YES NO

    23.18 Actual Melt temperature into the Furnace (at the end of melting): _______________

    YES NO

    23.19 Melt temperature at Start of Pouring: _______________

    YES NO

    23.20 Maximum Pouring Time Range required: _______________

    YES NO

    23.21 Actual Pouring Time: _______________

    YES NO

    23.22 Desprue YES/NO/NA

    23.23 If special processes are subcontracted (Welding, Shot Peening, Heat Treating and/or NDT) do the approved sources have active TPG accreditations as required by customer? YES/NO/NA

    23.24 Clean/Shot Blasting YES/NO/NA

    23.25 Grind/Inspect YES/NO/NA

    23.26 Packaging YES/NO/NA

    23.27 Shipping YES/NO/NA

     