22. JOB AUDIT #3 SECTION NA
22.1 Date: _______________
22.2 Job Number: _______________
22.3 Customer: _______________
22.4 Part Number: _______________
22.5 Drawing Number and Rev. Level: _______________
22.6 Molding Process: _______________
22.7 Core Making Process: _______________
22.8 Metal Type: _______________
22.9 Melt Equipment: _______________
YES NO
22.10 Heat Number: _______________
22.11 Operations Witnessed: YES/NO
22.12 Sand Preparation YES/NO
22.13 Mold Making YES/NO
22.14 Core Making YES/NO
22.15 Melting YES/NO
22.16 Pouring YES/NO
22.17 Required Melt temperature into the Furnace: _______________
YES NO
22.18 Actual Melt temperature into the Furnace (at the end of melting): _______________
YES NO
22.19 Melt temperature at Start of Pouring: _______________
YES NO
22.20 Maximum Pouring Time Range required: _______________
YES NO
22.21 Actual Pouring Time: _______________
YES NO
22.22 Desprue YES/NO/NA
22.23 If special processes are subcontracted (Welding, Shot Peening, Heat Treating and/or NDT) do the approved sources have active TPG accreditations as required by customer? YES/NO/NA
22.24 Clean/Shot Blasting YES/NO/NA
22.25 Grind/Inspect YES/NO/NA
22.26 Packaging YES/NO/NA
22.27 Shipping YES/NO
23. JOB AUDIT #4 SECTION NA
23.1 Date: _______________
23.2 Job Number: _______________
23.3 Customer: _______________
23.4 Part Number: _______________
23.5 Drawing Number and Rev. Level: _______________
23.6 Molding Process: _______________
23.7 Core Making Process: _______________
23.8 Metal Type: _______________
23.9 Melt Equipment: _______________
YES NO
23.10 Heat Number: _______________
23.11 Operations Witnessed: YES/NO
23.12 Sand Preparation YES/NO
23.13 Mold Making YES/NO
23.14 Core Making YES/NO
23.15 Melting YES/NO
23.16 Pouring YES/NO
23.17 Required Melt temperature into the Furnace: _______________
YES NO
23.18 Actual Melt temperature into the Furnace (at the end of melting): _______________
YES NO
23.19 Melt temperature at Start of Pouring: _______________
YES NO
23.20 Maximum Pouring Time Range required: _______________
YES NO
23.21 Actual Pouring Time: _______________
YES NO
23.22 Desprue YES/NO/NA
23.23 If special processes are subcontracted (Welding, Shot Peening, Heat Treating and/or NDT) do the approved sources have active TPG accreditations as required by customer? YES/NO/NA
23.24 Clean/Shot Blasting YES/NO/NA
23.25 Grind/Inspect YES/NO/NA
23.26 Packaging YES/NO/NA
23.27 Shipping YES/NO/NA