• 今天是:2024年5月18日 星期六东莞市纵横世纪企业管理咨询有限公司专注于航空航天汽车军工质量培训
  • 网站首页|加入收藏|联系我们
  • TGP风能电力特殊工序

    您当前所在的位置:首页 > 特殊工序 > TGP风能电力特殊工序

    63K
    青岛市TPG_AC7120认证_AC7120_电路卡组件的审核标准(19)
    发表时间:2021-07-20     阅读次数:     字体:【

    18.5.1.C Is the compliant pin assembly personnel trained for the task being performed and are training records available and up to date? YES/NO

    18.5.2.C Is the tool defined in the procedure being used? YES/NO

    18.5.3.C Are the assemblies inspected for compliant pin insertion compliance in accordance with the requirements? YES/NO/N/A

    18.5.4.C Does the supplier control the press to prevent compressive damage to the assembly and ensure compliance? YES/NO/N/A

    18.5.5.C If there is rework performed, is it done according to the procedure? YES/NO/N/A

    19 CLEANLINESS N/A

    19.1.P Are there procedures that define:

    a.P - Method to control cleanliness level, if final clean is not required? YES/NO/N/A

    b.P - Arrangement / placement in the machine of Circuit Card Assemblies? YES/NO

    c.P - Cleaning of non-hermetic components? YES/NO

    d.P - Temporary fixtures? YES/NO

    e.P - Control of dryness? YES/NO

    f.P - Selection and use of machine / manual processes? YES/NO

    g.P - Configuration management of tools and jigs? YES/NO/N/A

    h.P - Prevention of contamination or damage after cleaning (clean containers and racks, continuous flow)? YES/NO

    i.P - A method of monitoring concentration of cleaning solution, if saponifier is used?

    YES/NO/N/A

    j.P - Prevention of cross contamination of cleaning chemistries? YES/NO

    k.P - Method, frequency, and recording of variable data related to the verification of cleanliness to be less than 1.56 microgram/cm2 (10 microgram/in2 ) of NaCl or customer specification? YES/NO

    l.P - Maximum time between soldering and cleaning? YES/NO

    Audit Note: Maximum allowed time of 8 hours unless otherwise specified by customer or manufacturer’s recommendation.

    m.P - Setup, operation and maintenance of cleaning equipment? YES/NO

    n.P - A method of monitoring the resistivity / conductivity of final rinsing solution if required by the Customer? YES/NO/N/A

    CLEANLINESS COMPLIANCE

    19.1.C Are assemblies being arranged / placed in the machine per the procedure? YES/NO

    19.2.C If final clean is not required, is the cleanliness of assemblies controlled as specified in procedure? YES/NO/N/A

    19.3.C If components are identified as incompatible with cleaning process, are they protected during cleaning? YES/NO/N/A

    19.4.C If temporary fixtures are required, are they used? YES/NO/N/A

    19.5.C Are dryness controls specified in the procedure being applied per customer requirements?

    YES/NO

    19.6.C If specified to be used, are all tools and jigs under configuration control? YES/NO/N/A

    19.7.C If the cleaning chemistry has defined upper and lower concentration levels are they being monitored and controlled as per the procedure? YES/N/ N/A

    19.8.C Are controls in place to prevent cross contamination of cleaning chemistries according to


     
    上一篇:石家庄市TPG_AC7120认证_AC7120_电路卡组件的审核标准(18)
    下一篇:长春市TPG_AC7120认证_AC7120_电路卡组件的审核标准(20)