• 今天是:2024年5月18日 星期六东莞市纵横世纪企业管理咨询有限公司专注于航空航天汽车军工质量培训
  • 网站首页|加入收藏|联系我们
  • TGP风能电力特殊工序

    您当前所在的位置:首页 > 特殊工序 > TGP风能电力特殊工序

    63K
    宝鸡市TPG_AC7120认证_AC7120_电路卡组件的审核标准(17)
    发表时间:2021-07-19     阅读次数:     字体:【

    17.4.6.C Are the soldering tools set to the specified temperature for the solder alloy being used and are there controls in place that prevent the operator from arbitrarily adjusting the soldering iron tip temperature? YES/NO

    17.4.7.C Is there evidence that the preventive maintenance program is complete, including soldering iron tip replacement, calibration of soldering iron temperatures, and periodic cleaning of tooling? YES/NO

    17.4.8.C Are all drawings, written instructions, product specific fixtures under configuration control and do they match the assembly traveler? YES/NO

    17.4.9.C Are the work instructions including the sequence of operation being followed? YES/NO

    17.4.10.C Is the cleaning method being used as per the procedure and is the maximum time permitted between hand soldering and cleaning being observed?YES/NO

    Audit Note: Maximum allowed time of 8 hours unless otherwise specified by customer or manufacturer’s recommendation.

    17.4.11.C If used, are moisture sensitive components handles in accordance with the procedure

    YES/NO/N/A

    Audit Note: Yes or No only applies if there is a customer requirement

    18 SECONDARY ASSEMBLY N/A

    18.1 Mechanical Part Installation N/A

    18.1.1.P If used, is there a procedure for the installation/removal and replacement of self locking screws/nuts as per the manufacturer’s recommendations? YES/NO/N/A

    18.1.2.P If used, does the procedure prevent the re-use of self locking screws and nuts after removal? YES/NO/N/A

    18.1.3.P If used, is there a procedure for the fitment, removal, replacement and post

    replacement inspection of rivets as per the manufacturer’s specifications/customer requirements? YES/NO/N/A

    18.1.4.P If used, is there a procedure for the use and application of thread locking agents as per the manufacturer’s specifications and/or customer requirements? YES/NO/N/A

    Mechanical Part Installation COMPLIANCE

    18.1.1.C If used, are self locking screws and nuts only used once? YES/NO/N/A

    18.1.2.C If specified by the manufacturing documentation, is the correct torque being applied?

    YES/NO/N/A

    18.1.3.C If a specified torque is being applied is the tool calibrated or set / adjusted against the calibrated gauge prior to use? YES/NO/N/A

    18.1.4.C Is the mechanical assembly personnel trained for the task being performed and are training records available and up to date? YES/NO

    18.1.5.C Are all drawings, written instructions, product specific fixtures under configuration control and do they match the assembly traveler? YES/NO

    18.1.6.C Are all parts clearly identified during all kitting and fitment operations including consumable materials / shelf life? YES/NO

    18.1.7.C If the assembly instructions detail an assembly sequence, is it being followed? YES/NO/N/A

    18.1.8.C If used, is the rivet fitment, removal, replacement and post replacement inspection being performed as per the procedure? YES/NO/N/A


     
    上一篇:汉中市TPG_AC7120认证_AC7120_电路卡组件的审核标准(16)
    下一篇:石家庄市TPG_AC7120认证_AC7120_电路卡组件的审核标准(18)