• 今天是:2024年5月5日 星期日东莞市纵横世纪企业管理咨询有限公司专注于航空航天汽车军工质量培训
  • 网站首页|加入收藏|联系我们
  • TGP风能电力特殊工序

    您当前所在的位置:首页 > 特殊工序 > TGP风能电力特殊工序

    63K
    上海市TPG_AC7120认证_AC7120_电路卡组件的审核标准(24)
    发表时间:2021-07-22     阅读次数:     字体:【

    21.3.8.C Is the product identified as required by the procedure? YES/NO

    21.3.9.C When a failed product is found, is it segregated and identified as required by the procedure? YES/NO

    21.3.10.C Is there a closed loop improvement based on failure analysis? YES/NO

    21.3.11.C Is there evidence of test results and / or test measurements recorded as required by the procedure? YES/NO

    21.3.12.C Is there evidence of assembly acceptance (e.g.: stamp…)? YES/NO

    21.3.13.C Is the product packaged and handled as required by the procedure? YES/NO

    21.4 Boundary Scan Testing N/A

    21.4.1.P Are there procedures that define:

    a.P - Order in which the tests are carried out? YES/NO

    b.P - Setup and configuration for tools, fixtures, jigs and programs? YES/NO

    c.P - Work instructions? YES/NO

    d.P - Methodology for revision of tests including test program? YES/NO

    e.P - Methodology for validation of tests including repeatability, capability, coverage? YES/NO

    f.P - Assembly identification including customer specific requirements? YES/NO

    g.P - Identification and segregation of passed and failed assembly? YES/NO

    h.P - Failure analysis for close loop improvement? YES/NO

    i.P - Serialization and traceability of test results and/or measurements according to customer requirements? YES/NO

    j.P - Packaging / handling done as required? YES/NO

    Boundary Scan Testing COMPLIANCE

    21.4.1.C Is there evidence of operator training on ESD, handling, setup, operation, acceptance criteria? YES/NO

    21.4.2.C Is there evidence that maintenance has been carried out including calibration in accordance with the maintenance program? YES/NO

    21.4.3.C Are the test operations carried out in the order defined in the procedure? YES/NO

    21.4.4.C Is there evidence that the test configuration (tools, fixtures, jigs, test programs, probes adjustment / alignment) has been set-up according to the part number revision? YES/NO

    21.4.5.C Is there evidence that work instructions are always used at the work stations? YES/NO

    21.4.6.C Is there evidence that the methodology of tests revision is followed? YES/NO

    21.4.7.C Is there evidence that the methodology for validation of test (repeatability, capability, coverage, mechanical, and electrical damage) is being performed as per procedure? YES/NO

    21.4.8.C Is the product identified as required by the procedure? YES/NO

    21.4.9.C When a failed product is found, is it segregated and identified as required by the procedure? YES/NO

    21.4.10.C Is there a closed loop improvement based on failure analysis? YES/NO

    21.4.11.C Is there evidence of test results and / or test measurements recorded as required by the procedure? YES/NO

    21.4.12.C Is there evidence of assembly acceptance (e.g.: stamp…)? YES/NO

    21.4.13.C Is the product packaged and handled as required by the procedure? YES/NO

    21.5 Manual Testing N/A

    21.5.1.P Are there procedures that define:

    a.P - Order in which the tests are carried out? YES/NO

    b.P - Setup and configuration for tools, fixtures, jigs? YES/NO


     
    上一篇:济南市TPG_AC7120认证_AC7120_电路卡组件的审核标准(23)
    下一篇:北京市TPG_AC7120认证_AC7120_电路卡组件的审核标准(25)